http://repositorio.unb.br/handle/10482/23330
Fichier | Description | Taille | Format | |
---|---|---|---|---|
EVENTO_RestorationPublicWorksBrazil.pdf | 2,95 MB | Adobe PDF | Voir/Ouvrir |
Titre: | Restoration public works in Brazil : the costs analysis based on Federal Decree 7983/2013 |
Auteur(s): | Máximo, Marco Aurélio da Silva Galvão, Maria Amélia Mello Farias, Sylvio Carneiro de |
Assunto:: | Custo-benefício Patrimônio cultural - Brasil Edifícios históricos - conservação e restauração |
Date de publication: | oct-2016 |
Editeur: | Brazilian Institute of Cost Engineering (IBEC); Internacional Cost Engineering Council (ICEC) |
Référence bibliographique: | MÁXIMO, Marco Aurélio da Silva; GALVÃO, Maria Amélia Mello; FARIAS, Sylvio Carneiro de. Restoration public works in Brazil: the costs analysis based on Federal Decree 7983/2013. In: ICEC World Congress, 10., 2016, Rio de Janeiro. Anais eletrônicos... Rio de Janeiro: Brazilian Institute of Cost Engineering (IBEC); Internacional Cost Engineering Council (ICEC), 2016. Disponível em: <http://icec2016.com/pt/wp-content/uploads/2016/12/2016_012_ANAIS_BOOK-5.pdf>. Acesso em: 19 abr. 2017. |
Abstract: | The Brazilian Federal Decree 7.983/2013 lays down rules and criteria for the preparation of costs reference of works and engineering services, contractors and executed with federal funds, in addition to verification criteria of costs and the priority use of the National System of Costs Survey and Indexes of Construction - SINAPI, as the cost base reference. The guidelines established by the Brazilian Federal Court of Accounts - TCU, in particular the judgments 2.369/2011 and 2.622/2013, set the limits for all indirect costs - Budget Different Income – BDI. Restoration public works, executed with federal funds, must conform with the Federal Decree 7983/2013 and with the Federal Court of Accounts. How to do it if this kind of works is so particular and different from usual civil construction works? This paper intend to discuss if these requirements are possible to apply in restoration works and how to adapt this application, considering the particularities of this type of work. The proposed methodology, for analyzing the costs, includes the use of the following tools: ABC curve of services, evaluation of the BDI, criteria of the Federal Decree, use of SINAPI reference and other costs bases. It is possible that preservation institutes and designer professionals find a way to reduce distortions between different regions of the country and systematize cost compositions of restoration services. This article has the objective to disseminate the discussion about the similarities and the differences between restoration and civil construction works and to present a possible way to analyze the costs, and discuss the need to develop a cost reference to this type of public work in Brazil. |
metadata.dc.description.unidade: | Faculdade de Arquitetura e Urbanismo (FAU) Departamento de Tecnologia em Arquitetura e Urbanismo (FAU TEC) |
Licença:: | Autorização concedida ao Repositório Institucional da Universidade de Brasília (RIUnB) pelo organizador do evento, com os seguintes termos: disponível sob Licença Creative Commons 4.0 International, que permite copiar, distribuir e transmitir o trabalho, desde que seja citado o autor e licenciante. Não permite o uso para fins comerciais nem a adaptação desta. |
Collection(s) : | Trabalhos apresentados em evento |
Tous les documents dans DSpace sont protégés par copyright, avec tous droits réservés.