Skip navigation
Please use this identifier to cite or link to this item: http://repositorio.unb.br/handle/10482/16328
Files in This Item:
File Description SizeFormat 
2014_OsorioCarvalhoDias.pdf15,04 MBAdobe PDFView/Open
Title: Parcerias público-privadas como instrumento de implementação de políticas públicas
Authors: Dias, Osorio Carvalho
Orientador(es):: Medeiros, Janann Joslin
Assunto:: Política pública
Parcerias público-privadas
Administração pública
Issue Date: 26-Sep-2014
Citation: DIAS, Osorio Carvalho. Parcerias público-privadas como instrumento de implementação de políticas públicas. 2014. xvii, 317 f. Tese (Doutorado em Administração)—Universidade de Brasília, Brasília, 2014.
Abstract: Esta tese buscou entender e explicar as causas da baixa utilização de parcerias públicoprivadas na implementação de projetos de infraestrutura no âmbito da Administração Pública Federal (APF) brasileira. Partindo de uma base teórica vinculada à Nova Economia das Instituições (NEI), Implementação de Políticas Públicas e Teoria da Agência, o trabalho buscou identificar variáveis vinculadas a esses corpos teóricos que funcionassem como causas para tal desempenho. A pesquisa foi multicasos (trinta casos), com a utilização da Análise de Conteúdo em uma primeira etapa e Análise Qualitativa Comparativa (QCA) com Fuzzy Set em uma segunda etapa. As análises de conteúdo foram realizadas com o apoio dos softwares Express Scribe e Atlas.ti e a análise Fuzzy Set/QCA com a utilização do software fsQCA. Foram realizadas 62 entrevistas com atores envolvidos no cenário de implementação de PPPs no Governo Federal e nos estados da Bahia, Minas Gerais e São Paulo, escolhidos como referenciais comparativos. Ademais, foram analisados 841 documentos, com 67.042 páginas, que incluíram desde e-mails de técnicos envolvidos em projetos de PPP a todos os documentos de tramitação da Lei de PPP no Congresso Nacional. A tese mostra que, em relação a PPPs e para os casos estudados, a reduzida capacidade de coordenação do Governo Federal, a baixa capacitação dos técnicos responsáveis em todas as fases dos projetos e a aversão ao risco comercial dos empresários interessados tiveram influência preponderante no fracasso dos projetos planejados. Outras características presentes são deficiências no arcabouço legal, excesso/falhas na regulação, cláusulas contratuais mal definidas, medo de perda de controle do processo por parte da administração pública, falta/má alocação de orçamento público, influência de grupos/atores poderosos com interesses contrariados ou a serem favorecidos e diferenças políticas entre atores que estiveram, em momentos diversos, responsáveis pelos projetos, além da defesa de interesses partidários, ou simplesmente, tentativa de obstar projetos de legendas adversárias. Conclui-se que as instituições formais criadas/envolvidas na implementação de PPPs federais não foram suficientes para eliminar os problemas típicos de implementação de políticas públicas, conflitos Agente/Principal, assimetria de informação e comportamento oportunista, e muito menos impedir a manutenção de instituições informais que minaram as bases para o bom desenvolvimento dos projetos. Foi demonstrado nesta tese que não há um caminho apenas para resultados complexos, o que implica também que não deve haver apenas um caminho para a solução dos problemas encontrados. O que é importante é que responsáveis pela implementação de políticas públicas VIII de PPP atentem para as diversas variáveis que influenciam o projeto até mesmo antes de ele nascer, considerando as instituições formais criadas para disciplinar o jogo e as organizações criadas para atuarem como jogadores e, claro, todo o ambiente institucional em que tal projeto será inserido, incluindo as instituições formais preexistentes e as que surjam em decorrência. Não se pode importar conceitos vencedores de realidade institucional distintas do Brasil sem um estudo detalhado do ambiente brasileiro. Isso não combina com o açodamento oriundo da falta de planejamento na administração pública nacional. Constatou-se que se os modelos de PPP buscaram aproximar as contratações públicas de instrumentos de mercado, eles não se encaixam ao modelo de relação entre custos de governança e níveis de especificidade dos ativos. Em outras palavras, por ser ativos muito específicos, PPPs deveriam resultar em menores custos quando realizadas pela própria administração pública no mecanismo de governança hierárquica, ou no máximo governança híbrida. Embora fosse esperado que PPPs reduzissem os custos totais de implementação, a escassez de projetos com resultados concretos no Brasil impede uma avaliação holística e os custos de transação da fase de projeto tendem a afastar o gestor público das PPPs, consideradas soluções melhores, mas muito demoradas e complexas. _________________________________________________________________________________ ABSTRACT
This thesis sought to understand and explain the causes of the low level of utilization of the instrument of public - private partnership (PPP) in the implementation of infrastructure projects by the Brazilian Federal Public Administration (APF). Using a theoretical framework developed from the New Institutional Economics (NIE), studies on Policy Implementation and Agency Theory, the study sought to identify variables that might explain this phenomenon. The research was multi-case (30 cases), using content analysis techniques in the first stage of analysis and Fuzzy Set Qualitative Comparative Analysis (fsQCA) during the second and final stage. Content analyses were carried out using Express Scribe and Atlas.ti software and the Fuzzy Set/QCA analysis made use of the FsQCA software. Sixty-two (62) actors involved in the implementation of PPPs in the Federal Government setting and in the states of Bahia, Minas Gerais and São Paulo, chosen as comparative benchmarks, were interviewed. In addition, 841 documents totaling 67,042 pages were analyzed. A wide variety of documents was consulted, ranging from emails exchanged by technical staff involved in PPP projects to all the documents produced during the passage of the PPP Act by the Brazilian Congress. The thesis shows in the cases studied, three factors had preponderant influence on the failure to execute planned PPP projects: limited coordination capacity on the part of the Brazilian Federal Government, the lack of technical preparedness of government personnel at all stages of the process, and the commercial risk aversion of potentially interested entrepreneurs. Other influencing factors identified as contributing to the lack of implementation success were deficiencies in the legal framework, regulatory excess/failure, poorly-defined contract terms, fear of losing control of the process by public administrators, lack of/poor budget allocation, influence of powerful groups/actors whose interests might be thwarted or favored by project execution, political differences between actors responsible for the projects at different times during the process, whether in defense of partisan interests or the attempt to hinder projects of interest to opposing party members. It is concluded that the formal institutions created/involved in implementing federal PPP were not sufficient to eliminate problems typical to policy implementation, Principal/Agent conflicts, asymmetric information and opportunistic behavior, much less prevent the development or strengthening of informal institutions that undermined the basis for the successful execution of the planned projects. It has been shown in this thesis that there is not just a single explanation for the results of interest, which suggests that there will probably not be just a single solution for the X problems encountered. The findings suggest that it is important for those responsible for the implementation of public policies using the PPP instrument to pay attention from the outset, at the project design stage, and throughout the implementation process to the many factors that influence project outcomes. This includes taking into consideration the formal institutions created to regulate the process and the organizations, existing or specifically created, that act as players in the process. This means giving attention, as well, to the other elements of the institutional environment in which a project is to be inserted, including pre-existing informal institutions and others that may arise during the implementation process. Findings reinforce the perception that winning concepts cannot be imported from institutional realities different from those of Brazil without detailed study of how they can be adapted to the Brazilian environment. Such detailed study, however, appears inconsistent with the rush to implement often observed, perhaps typical of the lack of planning perceived as characteristic of Brazilian public administration. It was found that even though the PPP model adopted sought to align public contracting practices and market instruments, it failed to bring about the necessary alignment of the transaction costs of governance and the levels of asset specificity necessary. In other words, given the fact that they involve very specific assets, the use of the PPP instrument should result in lower costs than if the project were to be carried out by the government itself using the hierarchical governance mechanism or by some other form of hybrid governance. Although the expectation was that PPPs would reduce the total transactions costs of implementation, the high transaction costs at the design stage tend to distance public managers from using the PPP instrument, considered to be too time consuming and complex.
Description: Tese (doutorado)—Universidade de Brasília, Programa de Pós-Graduação em Administração, 2014.
Licença:: A concessão da licença deste item refere-se ao termo de autorização impresso assinado pelo autor com as seguintes condições: Na qualidade de titular dos direitos de autor da publicação, autorizo a Universidade de Brasília e o IBICT a disponibilizar por meio dos sites www.bce.unb.br, www.ibict.br, http://hercules.vtls.com/cgi-bin/ndltd/chameleon?lng=pt&skin=ndltd sem ressarcimento dos direitos autorais, de acordo com a Lei nº 9610/98, o texto integral da obra disponibilizada, conforme permissões assinaladas, para fins de leitura, impressão e/ou download, a título de divulgação da produção científica brasileira, a partir desta data.
Appears in Collections:Teses, dissertações e produtos pós-doutorado

Show full item record " class="statisticsLink btn btn-primary" href="/jspui/handle/10482/16328/statistics">



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.