Skip navigation
Veuillez utiliser cette adresse pour citer ce document : http://repositorio2.unb.br/jspui/handle/10482/45052
Fichier(s) constituant ce document :
Fichier Description TailleFormat 
CAPITULO_IntegratedDesignProcess.pdf1,29 MBAdobe PDFVoir/Ouvrir
Titre: An integrated design process in practice : a nearly zero energy building at the University of Brasília - Brazil
Auteur(s): Amorim, Cláudia Naves David
Silva, Joara Cronemberger Ribeiro
Silva, Caio Frederico e
Góes, Thiago Montenegro
Medeiros, Ayana Dantas de
Pimenta, João Manoel Dias
Egito, Marco Antonio
Bauchspiess, Adolfo
Velasco, Loana Nunes
Morales Sánchez, José Manoel
Assunto:: Edifícios - energia zero
Processo de projeto integrado
Simulação (Computadores)
Energia renovável
Date de publication: 2022
Editeur: IntechOpen
Référence bibliographique: AMORIM, Cláudia Naves David et al. An integrated design process in practice: a nearly zero energy building at the University of Brasília - Brazil. In: BIENVENIDO-HUERTAS, David (ed.). Nearly Zero Energy Building (NZEB): materials, design and new approaches. Londres: IntechOpen, 2022. p. 73-98. DOI: http://dx.doi.org/10.5772/intechopen.102443. Disponível em: https://www.intechopen.com/chapters/80658. Acesso em: 20 out. 2022.
Abstract: This study aims to present the design experience of LabZERO|UnB, an NZEB building awarded in a public call, that will be built on the University of Brasília campus. The method consisted of defining the design team and the Integrated Design Process (IDP), establishing assumptions and design guidelines, schematic design, initial computer simulations, design development, new simulations, and final calculations for the synthesis of energy performance. As a result, IDP proved to be efficient and underlined the possibility of translating research experiences into practice. The barriers and potentialities related to the coordination of a multidisciplinary team stand out, likewise the organization, planning, and achievement of goals. In the design concept of the 200m2 building, the basic assumption was the adequacy of the architecture to favor the use of passive resources, respecting the local climate, classified as high-altitude tropical climate. Moreover, bioclimatic strategies were used, such as the North/South orientation of main façades, narrow floor plan, limited windowwall ratio, and adequate construction materials, to optimize energy consumption. As a result, the distributed generation of electricity was estimated at 58.29 kWh/m2. a year and the final electricity demand was 34.29 kWh/m2. year. Hence, this process indicates the real possibility of reaching the zero energy balance.
metadata.dc.description.unidade: Faculdade de Arquitetura e Urbanismo (FAU)
Licença:: (CC BY) Individual chapters of this publication are distributed under the terms of the Creative Commons Attribution 3.0 Unported License which permits commercial use, distribution and reproduction of the individual chapters, provided the original author(s) and source publication are appropriately acknowledged. If so indicated, certain images may not be included under the Creative Commons license. In such cases users will need to obtain permission from the license holder to reproduce the material. More details and guidelines concerning content reuse and adaptation can be found at http://www.intechopen.com/copyright-policy.html.
DOI: http://dx.doi.org/10.5772/intechopen.102443
Collection(s) :Livros e afins

Affichage détaillé " class="statisticsLink btn btn-primary" href="/jspui/handle/10482/45052/statistics">



Tous les documents dans DSpace sont protégés par copyright, avec tous droits réservés.